[Skiboot] [PATCH v2 5/7] npu2-opencapi: ODL should be in reset when enabled
Andrew Donnellan
andrew.donnellan at au1.ibm.com
Wed Mar 13 13:32:23 AEDT 2019
On 13/3/19 7:35 am, Frederic Barrat wrote:
> We haven't hit any problem so far, but from the ODL designer, the ODL
> should be in reset when it is enabled.
>
> The ODL remains in reset until we start a fundamental reset to
> initiate link training. We still assert and deassert the ODL reset
> signal as part of the normal procedure just before training the
> link. Asserting is therefore useless at boot, since the ODL is already
> in reset, but we keep it as it's only a scom write and it's needed
> when we reset/retrain from the OS.
>
> Signed-off-by: Frederic Barrat <fbarrat at linux.ibm.com>
Reviewed-by: Andrew Donnellan <andrew.donnellan at au1.ibm.com>
> ---
>
> v2: update commit message
>
> hw/npu2-opencapi.c | 6 ++++++
> 1 file changed, 6 insertions(+)
>
> diff --git a/hw/npu2-opencapi.c b/hw/npu2-opencapi.c
> index 87e64492..223888e6 100644
> --- a/hw/npu2-opencapi.c
> +++ b/hw/npu2-opencapi.c
> @@ -308,6 +308,12 @@ static void enable_odl_phy_mux(uint32_t gcid, int index)
> assert(false);
> }
>
> + /*
> + * ODL must be in reset when enabling.
> + * It stays in reset until the link is trained
> + */
> + assert_odl_reset(gcid, index);
> +
> /* PowerBus OLL PHY Training Config Register */
> xscom_read(gcid, phy_config_scom, ®);
>
>
--
Andrew Donnellan OzLabs, ADL Canberra
andrew.donnellan at au1.ibm.com IBM Australia Limited
More information about the Skiboot
mailing list