On Mon, 2010-04-19 at 07:34 +1000, Michael Neuling wrote:
> > Are there any numbers available on how much they gain? It might be worth
> > to stick in real numbers instead of this alleged 15%.
>
> I get some gain numbers but obviously the workloads makes a huge
> difference. From a scheduler perspective, I assume an
> average/representative gain is best rather than an optimistic or
> pessimistic one?
Yeah, average would be best.
> We'll have different gains for SMT2 and SMT4, so we could change the
> gain dynamically based on which SMT mode we are in. Does that seem like
> something we should add as an arch hook?
That's the sort of thing you can use arch_scale_smt_power() for. But be
weary to not fall into the same trap I did with x86, where I confused
actual gain with capacity (When idle the actual gain is 0, but the
capacity is not).