<div dir="ltr"><div><div><div><div>Hi Dr. Ben,<br><br></div>I just realized that I have experienced results difference between what is listed right after the iteration finished (Jamali-PV = [.........]) and the following breakdown after running 100 iterration, although the simulation satisfy the reliability constraint (unserved energy 0.002 and LOLP 0.274). The last one is like this:<br><br>C:\Users\Yusak Tanoto\Documents\nemo-Indonesia\nemo-edited>python -m scoop evolve.py -s Jamali-PV -d scale:110 -g 100<br>[2017-09-28 09:13:14,854] launcher  INFO    SCOOP 0.7 1.1 on win32 using Python 2.7.13 (v2.7.13:a06454b1afa1, Dec 17 2016, 20:42:59) [MSC v.1500 32 bit (Intel)], API: 1013<br>[2017-09-28 09:13:14,854] launcher  INFO    Deploying 4 worker(s) over 1 host(s).<br>[2017-09-28 09:13:14,854] launcher  INFO    Worker distribution:<br>[2017-09-28 09:13:14,854] launcher  INFO       <a href="http://127.0.0.1">127.0.0.1</a>:       3 + origin<br>{'verbose': False, 'trace_file': None, 'fossil_limit': None, 'supply_scenario': 'Jamali-PV', 'carbon_price': 25, 'reserves': 0, 'discount_rate': 0.05, 'coal_price': 3.5, 'gas_price': 10.9, 'hydro_limit': 150.0, 'reliability_std': None, 'geothermal2_limit': 200.0, 'emissions_limit': None, 'ccs_storage_costs': 27.0, 'lambda_': None, 'bioenergy_limit': 20.0, 'demand_modifier': ['scale:110'], 're_limit': None, 'lolp_std': None, 'nsp_limit': 0.75, 'seed': None, 'list_scenarios': False, 'transmission': False, 'costs': 'Indonesia2030Mid', 'generations': 100, 'sigma': 2.0, 'min_regional_generation': None}<br>                  fitness         hallfame<br>                -----------     -----------<br>gen     nevals  min             min<br>0       15      1.38705e+15     1.38705e+15<br>1       15      2.3736e+14      2.3736e+14<br>2       15      71.7156         71.7156<br>3       15      68.5933         68.5933<br>4       15      61.9614         61.9614<br>5       15      60.905          60.905<br>6       15      56.781          56.781<br>--------------------------------------------<br>95      15      51.3926         51.3826<br>96      15      51.3702         51.3702<br>97      15      51.4275         51.3702<br>98      15      51.4273         51.3702<br>99      15      51.6488         51.3702<br>Jamali-PV: [15.409046732884701, 1.7222013518375101, 8.3462172104824983, 15.538314391372536, 10.556889362917959, 8.7746846991700274, 13.08950232073305, 8.0203929213724301, 11.047838934170874, 9.2266373469077383, 0, 16.541477118404561, 10.100857070020616, 20.518031615710981, 11.997746175400911, 12.387589958041254, 5.7491295143515693, 18.775730807261123, 7.6424579331404816, 2.0118168520321245, 0, 2.1059111519489067, 0, 10.465303019230809, 0, 1.8352937636816455, 0, 2.3753121109034288, 0, 2.4158953576921229, 0, 0, 0.34389522814178952, 2.9917206278015609, 0, 0, 0, 0, 0, 0, 0, 0]<br>Generators:<br>        polygon 1 PV (JAVA:1), 4.00 GW<br>           supplied 6.087 TWh, CF 17.4%, capcost $3,292,000,000, opcost $94,434,706, LCOE $50<br>        polygon 2 PV (JAVA:2), 1.72 GW<br>           supplied 2.73 TWh, CF 18.1%, capcost $1,417,371,712, opcost $40,702,818, LCOE $48<br>        polygon 3 PV (JAVA:3), 8.35 GW<br>           supplied 13.32 TWh, CF 18.2%, capcost $6,868,936,764, opcost $197,289,741, LCOE $48<br>        polygon 4 PV (JAVA:4), 2.00 GW<br>           supplied 3.196 TWh, CF 18.2%, capcost $1,646,000,000, opcost $47,278,229, LCOE $48<br>        polygon 5 PV (JAVA:5), 10.56 GW<br>           supplied 17.23 TWh, CF 18.6%, surplus 0.0 TWh, capcost $8,688,319,945, opcost $249,700,402, LCOE $47<br>        polygon 6 PV (BALI:6), 2.00 GW<br>           supplied 3.25 TWh, CF 18.6%, surplus 0.0 TWh, capcost $1,646,000,000, opcost $47,300,172, LCOE $47<br>        polygon 1 Hydro (JAVA:1), 1.40 GW<br>           supplied 12.26 TWh, CF 100.0%, capcost $3,220,000,000, opcost $122,203,200, LCOE $27, ran 8,760 hours<br>        polygon 2 Hydro (JAVA:2), 1.40 GW<br>           supplied 12.26 TWh, CF 100.0%, capcost $3,220,000,000, opcost $122,203,200, LCOE $27, ran 8,760 hours<br>        polygon 3 Hydro (JAVA:3), 1.40 GW<br>           supplied 12.26 TWh, CF 100.0%, capcost $3,220,000,000, opcost $122,203,200, LCOE $27, ran 8,760 hours<br>        polygon 4 Hydro (JAVA:4), 1.40 GW<br>           supplied 12.26 TWh, CF 100.0%, capcost $3,220,000,000, opcost $122,201,535, LCOE $27, ran 8,760 hours<br>        polygon 5 Hydro (JAVA:5), 0.00 GW<br>           supplied 0 TWh, ran 0 hours<br>        polygon 6 Hydro (BALI:6), 1.40 GW<br>           supplied 12.25 TWh, CF 99.9%, capcost $3,220,000,000, opcost $122,134,899, LCOE $27, ran 8,758 hours<br>        polygon 1 Geothermal2 (JAVA:1), 1.70 GW<br>           supplied 14.85 TWh, CF 99.7%, capcost $3,763,800,000, opcost $78,397,693, LCOE $21, ran 8,741 hours<br>        polygon 2 Geothermal2 (JAVA:2), 1.70 GW<br>           supplied 14.84 TWh, CF 99.6%, capcost $3,763,800,000, opcost $78,386,233, LCOE $21, ran 8,734 hours<br>        polygon 3 Geothermal2 (JAVA:3), 1.70 GW<br>           supplied 14.82 TWh, CF 99.5%, capcost $3,763,800,000, opcost $78,372,169, LCOE $21, ran 8,720 hours<br>        polygon 4 Geothermal2 (JAVA:4), 1.70 GW<br>           supplied 14.79 TWh, CF 99.3%, capcost $3,763,800,000, opcost $78,354,297, LCOE $21, ran 8,712 hours<br>        polygon 5 Geothermal2 (JAVA:5), 1.70 GW<br>           supplied 14.71 TWh, CF 98.8%, capcost $3,763,800,000, opcost $78,296,674, LCOE $21, ran 8,686 hours<br>        polygon 6 Geothermal2 (BALI:6), 1.70 GW<br>           supplied 14.58 TWh, CF 97.9%, capcost $3,763,800,000, opcost $78,203,953, LCOE $22, ran 8,621 hours<br>        polygon 1 Black_Coal (JAVA:1), 7.64 GW<br>           supplied 63.06 TWh, CF 94.2%, capcost $10,332,603,125, opcost $3,716,523,908, LCOE $69, ran 8,536 hours, 48.7 Mt CO2<br>        polygon 2 Black_Coal (JAVA:2), 2.01 GW<br>           supplied 15.29 TWh, CF 86.8%, capcost $2,719,976,383, opcost $908,983,808, LCOE $71, ran 7,786 hours, 11.8 Mt CO2<br>        polygon 3 Black_Coal (JAVA:3), 0.00 GW<br>           supplied 0 TWh, ran 0 hours, 0.0 Mt CO2<br>        polygon 4 Black_Coal (JAVA:4), 2.11 GW<br>           supplied 15.09 TWh, CF 81.8%, capcost $2,847,191,877, opcost $902,696,769, LCOE $72, ran 7,401 hours, 11.7 Mt CO2<br>        polygon 5 Black_Coal (JAVA:5), 0.00 GW<br>           supplied 0 TWh, ran 0 hours, 0.0 Mt CO2<br>        polygon 6 Black_Coal (BALI:6), 10.47 GW<br>           supplied 51.96 TWh, CF 56.7%, capcost $14,149,089,682, opcost $3,262,468,410, LCOE $80, ran 6,931 hours, 40.2 Mt CO2<br>        polygon 1 CCGT (JAVA:1), 0.00 GW<br>           supplied 0 TWh, ran 0 hours, 0.0 Mt CO2<br>        polygon 2 CCGT (JAVA:2), 1.84 GW<br>           supplied 3.332 TWh, CF 20.7%, capcost $1,224,140,940, opcost $343,150,725, LCOE $126, ran 2,187 hours, 1.3 Mt CO2<br>        polygon 3 CCGT (JAVA:3), 0.00 GW<br>           supplied 0 TWh, ran 0 hours, 0.0 Mt CO2<br>        polygon 4 CCGT (JAVA:4), 2.38 GW<br>           supplied 2.97 TWh, CF 14.3%, capcost $1,584,333,177, opcost $324,434,534, LCOE $143, ran 1,539 hours, 1.2 Mt CO2<br>        polygon 5 CCGT (JAVA:5), 0.00 GW<br>           supplied 0 TWh, ran 0 hours, 0.0 Mt CO2<br>        polygon 6 CCGT (BALI:6), 2.42 GW<br>           supplied 1.736 TWh, CF 8.2%, capcost $1,611,402,203, opcost $215,305,545, LCOE $184, ran 970 hours, 0.7 Mt CO2<br>        polygon 1 OCGT (JAVA:1), 0.00 GW<br>           supplied 0 TWh, ran 0 hours, 0.0 Mt CO2<br>        polygon 2 OCGT (JAVA:2), 0.00 GW<br>           supplied 0 TWh, ran 0 hours, 0.0 Mt CO2<br>        polygon 3 OCGT (JAVA:3), 0.34 GW<br>           supplied 0.1483 TWh, CF 4.9%, capcost $130,336,291, opcost $28,805,117, LCOE $251, ran 468 hours, 0.1 Mt CO2<br>        polygon 4 OCGT (JAVA:4), 2.99 GW<br>           supplied 0.5199 TWh, CF 2.0%, capcost $1,133,862,117, opcost $136,698,620, LCOE $404, ran 383 hours, 0.4 Mt CO2<br>        polygon 5 OCGT (JAVA:5), 0.00 GW<br>           supplied 0 TWh, ran 0 hours, 0.0 Mt CO2<br>        polygon 6 OCGT (BALI:6), 0.00 GW<br>           supplied 0 TWh, ran 0 hours, 0.0 Mt CO2<br>        polygon 1 Biomass (JAVA:1), 0.00 GW<br>           supplied 0 TWh, ran 0 hours<br>        polygon 2 Biomass (JAVA:2), 0.00 GW<br>           supplied 0 TWh, ran 0 hours<br>        polygon 3 Biomass (JAVA:3), 0.00 GW<br>           supplied 0 TWh, ran 0 hours<br>        polygon 4 Biomass (JAVA:4), 0.00 GW<br>           supplied 0 TWh, ran 0 hours<br>        polygon 5 Biomass (JAVA:5), 0.00 GW<br>           supplied 0 TWh, ran 0 hours<br>        polygon 6 Biomass (BALI:6), 0.00 GW<br>           supplied 0 TWh, ran 0 hours<br>Timesteps: 8760 h<br>Demand energy: 349.8 TWh<br>Unused surplus energy: 0.0 TWh<br>Timesteps with unused surplus energy: 11<br>Unserved energy: 0.002%<br>Unserved total hours: 23<br>Number of unserved energy events: 14<br>Shortfalls (min, max): (34.0, 667.0)<br>Loss of Load: 0.26%<br>Total hours of Loss of Load: 23<br><br>Score: 51.37 $/MWh<br>Total emissions: 116.08 MtCO2<br><br></div>What do you think this happened?<br><br></div>Thank you so much for your help,<br><br></div>Yusak<br><div><div><div><div><br></div></div></div></div></div>